Fine day and the brick work is dry. Looks great. The brickwork looks a bit lighter than the bottom. Oh well. But me no complain.
The gyprock was finished today with the cornices ready to be attached. All the joins filled and smoothed out.
We are approcahing lock-up stage.
My son in the master bedroom looking out.
Cupboards/cabinets arrived, ready to be installed. Also looking at the ensuite
Some more in the study
Another view
Entrance door
Living (study) looking into the dining area. This cutout is not a standard feature, we asked for it, because we saw it at the display home. If was free of charge.
Living (study) room windows
The three niches. The kids love getting into the picture.
Family to dining (open design)
Bifolds into the alfresco area
View through the cutout
Bedroom 4
Landry taps
Remember this wall, holding up the main road behind
Water tank goes here.
Bathroom, starting to look good.
Our alcove in the master bedroom
Bedroom 2.
Dining
Living (my study)
No comments:
Post a Comment