Saturday, October 16, 2010

Gyprocked (d64)

Fine day and the brick work is dry. Looks great. The brickwork looks a bit lighter than the bottom. Oh well. But me no complain.

The gyprock was finished today with the cornices ready to be attached. All the joins filled and smoothed out.

We are approcahing lock-up stage.


My son in the master bedroom looking out.

Cupboards/cabinets arrived, ready to be installed. Also looking at the ensuite

Some more in the study
Another view
Entrance door

Living (study) looking into the dining area. This cutout is not a standard feature, we asked for it, because we saw it at the display home. If was free of charge.

Living (study) room windows

The three niches. The kids love getting into the picture.

Family to dining (open design)

Bifolds into the alfresco area

View through the cutout

Bedroom 4

Landry taps

Remember this wall, holding up the main road behind

Water tank goes here.
Bathroom, starting to look good.

Our alcove in the master bedroom

Bedroom 2.

Dining

Living (my study)

No comments: