Thursday, September 9, 2010

Frame continues (d27)

Looks like there are ready to do the more detailed stuff. It's amazing how much temporary bracing is required. Everything needs to straight and square and diagonal braces are strong enough to hold in place. Putting the posts for the portico here

French doors will go here

roof going on


Rear of house



I've got rocks and mud falling into this drain pipe. Hope it doesn't block the system.




Here's my tank overflow.





Here's an odd defect in the timber.


What the rain did

Here the three wall niches will go.

Hallway


Kitchen goes here

Looking at the kitch again


View from the back yard

Outdoor area


Again

Another shot

Garage

Front entrance

No comments: