Friday, July 23, 2010

Pouring block wall footings

Today they excavated the footings for the other wall, and poured it. The brickies are on site organising the blocks to build up tomorrow. Sleepers will go in tomorrow. A small crane was hired to do the job.

gravel for backfill




It seems like we've developed quite a mound of excavated soil. It's making me feel very uneasy about the fill I asked to be delivered. I might not even need it. I thought the amount of soi that comes out, would be enough to go back in.


Metricon came on site to place the portaloo on and also attach their sign. I should tell my SS that he's not a good speller. It should be Coventry